GMV for sustainability and the planet

Today, more than ever, it is becoming clear that companies must follow a line of social responsibility towards future generations.

We are therefore installing a modern photovoltaic system on the roof of the Novara factory (Italy), which will enable self-production of energy from renewable sources (sunlight) from September 2022.

Installation area of 1000KWp photovoltaic system (perimeter in red)

 

 

At GMV, we consider one of our missions to work for sustainability and the planet, ensuring the needs of the present without compromising the needs of future generations.

Related posts:

https://www.gmveurolift.es/ahorra-factura-de-la-luz-con-el-ascensor-gmv/

https://www.gmveurolift.es/ahorro-en-el-recibo-de-la-luz-en-consumo-y-potencia-contrada/

https://www.gmveurolift.es/ahorro-electrico/

Related
Categories

Leave a Reply

Your email address will not be published. Required fields are marked with *